by v12 » Fri Aug 30, 2019 10:28 pm
Given the amount of rain yesterday, the temperatures were pretty bearable inside, or better, with the aircons running, it became a little chilly at the upper level pouch.
I spoke with the manager, and they do have plans to add heat insulation to the roof (a proper one, with a secondary insulating roof underneath the current tin plating, with a 30 cm gap, allowing the building up heat to get out using the chimney effect).
Also, they plan to cover the only outside wall of the building, once the building on that side is finished, so less heat would be able to come in.
They also installed a huge airco in the hall itself. Should be operational by now.
The whole factory complex is getting more filled up by now. Motobike and car park are overflowing now.
Given the amount of rain yesterday, the temperatures were pretty bearable inside, or better, with the aircons running, it became a little chilly at the upper level pouch.
I spoke with the manager, and they do have plans to add heat insulation to the roof (a proper one, with a secondary insulating roof underneath the current tin plating, with a 30 cm gap, allowing the building up heat to get out using the chimney effect).
Also, they plan to cover the only outside wall of the building, once the building on that side is finished, so less heat would be able to come in.
They also installed a huge airco in the hall itself. Should be operational by now.
The whole factory complex is getting more filled up by now. Motobike and car park are overflowing now.